Rainwater Harvesting Price in Manali New Town
Rainwater Harvesting price in Manali New Town is about ₹26,600 per house (supply and labour), our indicative rate as of 5 October 2026. It is a finished job: the contractor we book does the work at your site in Manali New Town and we bill it, after confirming the scope and the day's rate. Call +91 90039 03003 to order.
Today's Rainwater Harvesting rate (dated) · Directions to our sales desk · See Manali New Town on the map

Quick answers: Rainwater Harvesting in Manali New Town
- Is there a rainwater harvesting contractor near me in Manali New Town?
- Call +91 90039 03003 or WhatsApp: M&B Chetty India books rainwater harvesting in Manali New Town (PIN 600103), as a finished job by the contractor we book.
- Who does rainwater harvesting near Manali New Town?
- We do: you buy from M&B Chetty India, the seller, for sites in Manali New Town and next door in Kadapakkam (1.3 km away) and Edayanchavadi (1.7 km), at the same rate, about ₹26,600 per house.
- Can I book rainwater harvesting in Manali New Town?
- Yes, anywhere in Manali New Town (North Chennai, Chennai district, PIN 600103): we take your order for the work in Manali New Town, the contractor we book does it at your site, and we bill it.
- Where can I find a cheap rainwater harvesting contractor in Manali New Town?
- ₹26,600 per house for Manali New Town, our indicative rate, about 5% below the Chennai market rate we checked; the scope and the materials change the price, so the sales desk confirms it with each order. Compare quotes on the same basis: per house, supply and labour, built at the site; GST basis not stated.
- What is the price of rainwater harvesting in Manali New Town?
- About ₹26,600 per house for Rooftop rainwater harvesting for an independent house: downpipes, filter and one recharge pit in Manali New Town, as of 5 October 2026 (per house, supply and labour, built at the site; GST basis not stated); grades sold per house run from ₹26,600 to ₹71,250.
- What is the rainwater harvesting rate per house in Manali New Town?
- The rate we quote for Manali New Town is ₹26,600 per house for Rooftop rainwater harvesting for an independent house: downpipes, filter and one recharge pit (per house, supply and labour, built at the site; GST basis not stated); the contractor we book does the work and we bill it.
- What is the rainwater harvesting rate in Manali New Town today?
- See our Rainwater Harvesting rate today page for the dated daily rate for Chennai; our price list of 5 October 2026 puts rainwater harvesting for Manali New Town at ₹26,600 per house, and a call to +91 90039 03003 confirms it for your order.
Rainwater Harvesting price in Manali New Town: every grade and size
| Grade / size | Indicative rate | Unit | Price as of |
|---|---|---|---|
| Rooftop rainwater harvesting for an independent house: downpipes, filter and one recharge pit | ₹26,600 | per house | 5 Oct 2026 |
| Full rainwater harvesting with gutters, filters, recharge and storage reuse, larger house | ₹71,250 | per house | 5 Oct 2026 |
Basis: Per house, supply and labour, built at the site; GST basis not stated. Our indicative rate as of 5 October 2026, about 5% below the Chennai market rate we checked; the scope and the materials change the price, and we confirm it with each order. The same rate applies across our Chennai delivery zones; today's Rainwater Harvesting rate carries the dated daily figure.
How rainwater harvesting is booked in Manali New Town
M&B Chetty India is the seller: we take your order for the work in Manali New Town, the contractor we book does it at your site, and we bill it. The scope and the materials change the price, so we confirm it and the day's rate with each order.
Lead time and minimum quantity: confirmed with your order for Manali New Town; we do not publish a fixed lead time for rainwater harvesting.
Our crushed stone for the same site: Manali New Town is about 95 km and 3–3.5 h by truck from our crusher at Perindesam. If you also order jalli, M-Sand or TMT from us for the site, we can time rainwater harvesting with those loads, as described below.
How we supply it: M&B Chetty supplies rainwater harvesting as a finished job: the plumber or contractor we book builds it at your site, and we bill the work. The filter media are ours: 40 mm and 20 mm jalli and M-Sand from our crusher, best added to a load you are already ordering since our minimum is one tipper load.
Photo: Stack of plastic pipes (Ries Bosch on Unsplash; a stock photo for the plumbing & sanitary range, see image credits).
Rainwater Harvesting for Manali New Town buildings
What is being built in Manali New Town: Independent houses and floor additions on township plots; Hard standing for container and truck yards nearby.
About Manali New Town
Manali New Town (Manali Pudhunagar) is a residential township the CMDA laid out in the 1980s north of Manali, along the Tiruvottiyur–Ponneri–Panchetti Road, with its own post office (600103). Unlike Manali's refinery and fertiliser belt, its Phase I and II layouts are zoned residential, though its position between the Kamarajar, Chennai and Kattupalli ports has drawn container freight stations and truck parking around it. Work is houses and floor additions on township plots, plus hard standing for nearby yards.
Manali New Town (மணலி புதுநகர்) · North Chennai · Chennai, Tamil Nadu · PIN 600103 · landmarks: Tiruvottiyur–Ponneri–Panchetti (TPP) Road
How much rain your roof collects
Worked example for Manali New Town (typical estimate): A 1,000 sq ft roof collects about 90,000–1,00,000 litres of rain a year. Your engineer's figures come first.
Typical figures from our Rainwater Harvesting guide, to start from:
Typical estimate: Roof area × annual rainfall × about 0.8 runoff for a concrete roof. Chennai's average annual rainfall is roughly 1,200–1,400 mm, most of it in October to December.
- 1,000 sq ft roof (92.9 m²): about 90,000–1,00,000 litres a year
- One 100 mm rainy day on that roof: about 7,400 litres
- A 1.2 × 1.2 × 1.5 m recharge pit holds about 2.2 m³ of fill, roughly 3.4 MT of jalli and sand at our bulk densities
Rainwater Harvesting: what it is, types, checks and quantities
Rainwater Harvesting in areas near Manali New Town
Kadapakkam
₹26,600per house, same rate as Manali New TownNorth Chennai · PIN 6001031.7 km from Manali New TownEdayanchavadi
₹26,600per house, same rate as Manali New TownNorth Chennai · PIN 6001032.5 km from Manali New TownVellivoyalchavadi
₹26,600per house, same rate as Manali New TownNorth Chennai · PIN 6001033.0 km from Manali New TownVichoor
₹26,600per house, same rate as Manali New TownNorth Chennai · PIN 6001033.2 km from Manali New TownSadayankuppam
₹26,600per house, same rate as Manali New TownNorth Chennai · PIN 6001033.6 km from Manali New TownAmullaivoyal
₹26,600per house, same rate as Manali New TownNorth Chennai · PIN 600103Neighbouring localities we also deliver to: Kadapakkam, Edayanchavadi, Vellivoyalchavadi, Vichoor, Sadayankuppam, Amullaivoyal
Rainwater Harvesting in Manali New Town: questions
Do you also take rainwater harvesting orders in Kadapakkam, Edayanchavadi and Vellivoyalchavadi?
Yes. We take rainwater harvesting orders for sites in Kadapakkam, Edayanchavadi, Vellivoyalchavadi, Vichoor, Sadayankuppam and Amullaivoyal as well, at the same rate as Manali New Town, as a finished job by the contractor we book.
Who is the seller of rainwater harvesting for a site in Manali New Town?
M&B Chetty India is the seller: we take your order for the work in Manali New Town, the contractor we book does it at your site, and we bill it (per house, supply and labour, built at the site; GST basis not stated). The scope and the materials change the price, so we confirm it with each order.
Is rooftop rainwater harvesting compulsory in Tamil Nadu?
Yes. Tamil Nadu made rainwater harvesting structures compulsory for buildings in 2003, and approval authorities expect them on new building plans. Check your local body's current requirement when you apply for approval.
Why is rain water harvesting mandatory?
Groundwater in Chennai and its suburbs is heavily drawn down, and coastal aquifers face seawater intrusion. Recharging rooftop water restores wells and borewells and reduces street flooding during the monsoon.
From our team
Notes, photos and examples added by the M&B Chetty team, with the author and the date.
More factory-direct items in Manali New Town
- Water Tank price in Manali New Townplumbing & sanitary
- SWR Pipe price in Manali New Townplumbing & sanitary
- Paver Block price in Manali New Townpavers & kerb stones
- CPVC Pipe price in Manali New Townplumbing & sanitary
- uPVC Pipe price in Manali New Townplumbing & sanitary
- Sanitaryware price in Manali New Townplumbing & sanitary
Delivered with it in Manali New Town
- 40mm Jalli price in Manali New Towndelivered price
- 20mm Jalli price in Manali New Towndelivered price
- M-Sand price in Manali New Towndelivered price
Rainwater Harvesting elsewhere
Need rainwater harvesting in Manali New Town?
Call, WhatsApp or send the quote form with it filled in: we confirm the scope, the price and the date, and the contractor we book does the work at your site.
Manali New Town area pageToday's Rainwater Harvesting rateRainwater Harvesting